Hello all,
I hope everyone had a safe and happy Thanksgiving holiday.
Well, engine is in and running. I still have one lifter knocking so I must not have set it properly. But it runs, HOORAY!!
My total outlay for the rebuild and restoration was about $2500.
It was about $850 for machine work including balancing and heads.
Mine had never been bored so I only went .020" over.
Another $850 in engine internal parts including forged pistons.
The balance was bolt-ons and engine bay stuff. This included everything necessary to freshen the engine bay (some wiring harnesses, alternator, air cleaner, valve covers, carb. kit, dist. cap, plugs, wires, hoses, clamps, fuel pump, paint, brake lines, etc.
Total time is probably 175-200 hrs. spent over three months to complete it. Every part was sand blasted, primed and painted. I used all my original hardware so each screw, nut and washer got degreased and wire brushed. I assembled the engine myself too, great fun!!
Everything takes twice as long as you think......
For example, I spent 2 hrs. removing the exhaust donuts as they became one with the H-pipe flanges and I had to chisel them out. I should have done it with the engine out but would have thought they'd be difficult. I think they were the originals as the H-pipe has never been changed.
Always allow plenty of time and don't get in a hurry. It'll still be there tomorrow........
I will post some pics once it's complete, I promise. I can also send in process pics by e-mail if anyone's interested.
I still have to fix the lifter knock, mount the hood hinges and align the hood, bleed the brakes (new SS lines), and splice a three prong alternator harness plug into my gauge harness (mine is MIA). With any luck I'll be motoring by next weekend.
Thanks for your time........
Mark